Most early teams don’t fail from lack of vision. They fail from the gaps between what they imagined and what they actually built.
The three gaps
There’s the product gap between idea and prototype. The engineering gap between prototype and production. And the operational gap between launch and scale.
The teams that ship treat each one as a system to close, not a phase to wait out.